Strict Quality Control System

未标题-1.jpg

During the molding process,heat and pressure are accurately controlled and monitored in the composite curing ovens.Each carbon rim takes almost 30 steps in process and needs 7 days from start to finish. 

We have a strict quality check and record in each step.Five times QC will be requested during the whole process.

  • The First Time Quality Control

During the rim layup process,our technicians need to check the rim weight before the molding process.

卷料.png

  • The Second Time Quality Control

We have to inspect the rim appearance and air leakage test after before CNC Machining process.

质检-2.png

  • The Third Time Quality Control

Our technicians need to inspect the hole angle,rim appearance,the residue.

QC3.jpg

  • The Fourth Time Quality Control

All rims are 100% inspected and visual checked after sanding process.

QC4.jpg

  • The Fifth Time Quality Control

The final final inspection before packing.

质检-3.png